Patterson Architects Projects

01
Upgrades to the existing facility, new carpet, paint, tile, ceilings, HVAC and window coverings. The exterior plaster was patched and painted and a mow strip was added to the exterior walls.
  • Renovations to Bowen Elementary 2009
  • Renovations to Bowen Elementary 2009
  • Renovations to Bowen Elementary 2009

Posted in: Education K-12
Actions: E-mail | Permalink |